Condition for installing a revolving door

[China Glass Net] The installation of automatic doors requires high-precision parameter potential, so in order to ensure the installation accuracy, performance and automatic revolving door advantages of revolving doors, the installation of revolving doors must meet certain conditions:

Construction equipment such as scaffolding that affects the installation of the revolving door and the scaffolding that affects the installation of the revolving door shall be removed to ensure that the installation of the revolving door is not affected.

Second, there should be independent warehouses at the construction site in the field, and the storage points should be safe.

Third, after the installation process or installation is completed, except for the installation and maintenance personnel of the company, it is strictly forbidden for anyone else to step on or place any items on the top of the swing door.

Fourth, the requirements for the ground: the surface of the revolving door door installation should be a smooth horizontal plane, and the unevenness of the ground on both sides of the door should be <+1.5mm. The revolving door is fixed with 10mm expansion bolts, so the ground quality is required to be solid, and the floor thickness is at least 80mm, while the underground has no factors affecting the installation (such as pipes, lines, etc.). And the installation of the revolving door shall be carried out after the marble is finished and the ground is completely cured, and the prescribed curing period is not less than 5 days (120 hours).

Fifth, during the installation process or after the installation of the revolving door, if other projects are carried out on site, care should be taken to protect the revolving door. Do not touch the revolving door to avoid damage to the outer decorative panel and the smashed glass. During the electrical welding work, Mars shall not be placed on the turnstile and the surrounding door to avoid burning the exterior trim and the glass surface.

Sixth, the power requirements:

1. For automatic revolving door, in order to use safety and maintenance, separate automatic door revolving door power supply (AC 220V, 50Hz, 20A) should be installed.

2. Apply three cables, one set of 2.5, one of which is the protective ground wire, and the terminal is closed at the reserved frame, and the height is in the range of (revolving door door degree +100) mm to (revolving door leaf height +150) mm.

3. If there is remote control or fire control, it is necessary to close the frame at the reserved position, and the height is in the range of (revolving door fan +100) mm to (revolving door leaf height +150) mm.

Seventh, after the revolving door is delivered, when cleaning the upper glass or other decorative surface of the rotating door, do not splash water on the revolving door, and do not directly wash it with water, otherwise it will cause short circuit and burn electrical components. Cause unnecessary losses to customers.

Eighth, the two sides of the wall: the sides are marble or other material wall surface, you need to reserve the revolving door frame to close the position as required.

Ninth, door height: the height of the revolving door door ≥ (the total height of the revolving door in the contract signed +50mm) to ensure installation and maintenance.